Non-residential permits: commercial, industrial and institutional buildings
A permit application is needed to construct a new non-residential building (ICI) or to alter an existing non-residential building.
Check whether you need a permit
A building permit is a formal permission from Richmond Hill to start a building project.
- A new building, including temporary and farm buildings
- Renovating a building, or a material alteration of a building
- An addition to a building, including sunrooms
- Altering the interior of a building, including finishing a basement
- Moving a building
- Demolishing a building
- Changing the use or occupancy of a building
- Altering or remodelling a plumbing and/or HVAC system
- Installing or modifying a sprinkler system
- Installing or modifying a fire alarm system
- Constructing a retaining wall and any other designated structures
- Installation or alteration to an on-site sewage system
- During the planning phase of your project, you must determine what zoning requirements apply to your property. For all zoning and compliance-related information, visit Zoning and Compliance Letter Requests.
- Please note that we do not provide zoning information over the phone or in person at this time.
When is a permit not required?You don't need a building permit for the following projects:
- Constructing a detached accessory building that has an area of 10 m2 (≈ 108 sq ft) or less and contains no plumbing.
- Constructing a one storey storage shed, that has an area of 15 m2 (≈ 161 sq ft) or less and contains no plumbing.
- Painting or decorating
- Installing kitchen or bathroom cupboards
- Landscaping
- Roof shingling, unless it is a clay tile roof
- Eavestroughing
- Damp-proofing a basement
- Making minor repairs to bricks or blocks
- Projects that do not require a building permit still need to follow Richmond Hill's zoning by-laws.
- Only if you are applying for a Tenant Permit
Tenant permits
- Tenant Permit Checklist and Application
- Guide for New Businesses
Prepare your plans and documents0 of 37
Upload your required attachments with the following naming convention: ### Street Name Building Permit
You need an account to see these 37 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.
Complete the forms9
Richmond Hill offers the following forms and checklists to help you complete your permit application correctly.
Submit your application
There are two steps to the online submission process: Pre-screening and Formal application.
- All types of building permits applications (residential and non-residential) can be applied for on-line. Online applications are processed and issued electronically following online payment by credit card.
- Eligible applications are reviewed and processed electronically.
- When the building permit is issued, it is the responsibility of the permit holder to print the permit card and relevant drawings/documents (in colour) and keep them on the construction site.
- When a pre-screening submission is made, a reference number will be assigned and the Building Division will pre-screen your submission to determine if all of the submission requirements are included.
- Where it is determined that the acceptance criteria has been satisfied through the pre-screening stage, you will be advised by email from Building Division staff the requirements to move to the formal application stage, including the applicable fee based on the fee schedule.
- Where the submission is deemed to be insufficient, you will continue to coordinate with Building Division staff until such time the submission is determined to be acceptable.
- Once a confirmation email is received with a list of outstanding items (including the applicable fee), you are ready to complete your application.
- Following the instructions provided, you will reply to the email with a reference to the assigned reference number and attach any outstanding PDFs as requested (if any). If no further attachment is necessary, simply advise the Building Division staff member before you make the required payment.
- Please note that the formal submission must be made and the applicable fee must be received in full within two weeks from the date in which the confirmation email is sent by the Building Division. Otherwise, the reference number will no longer be valid and you will need to resubmit all relevant files and documents.
- Applications for any building permit will be reviewed for completeness and you will hear from us within 2 business days.
- Complete applications for small building permits will be reviewed and you will hear from us within 15 business days.
- Complete applications for large building permits will be reviewed and you will hear from us within 20 business days.
- Complete applications for complex building permits will be reviewed and you will hear from us within 30 business days.
Pay the fee
- Building permit fees are calculated according to By-law 19-24.
- Permit fees tables, based on class of construction and scope of work, can be found in Schedule "A", Section (3), By-law 19-24.
- All permit fees are due at the time of permit application. When application fees are in excess of $20,000, applicants may elect to pay 50% of the fee at the application stage and the balance at the time of permit issuance.
- A building permit fee is required to complete the application. Online applications must be paid online by credit card (Visa or Mastercard).
- Payment by Visa or MasterCard is limited to a maximum of $100,000.00. Any balance of payment may be paid by cash or cheque.
Written from Richmond Hill’s own pages as published on 19 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice