1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

Permit guideKitchenerBuilding PermitsHouses

New home permits

You need a building permit to build a new residential building, including a detached home, semi-detached home, detached duplex or rowhouse.

From Kitchener’s own pages, checked Oct 2026.

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

  1. Check whether you need a permit

    You need a building permit to build a new residential building, including:

    • detached home
    • semi-detached home
    • detached duplex
    • rowhouse
  2. Designer requirements

    • All submitted drawings must be prepared by either the owner, or prepared and reviewed by a qualified designer, architect, professional engineer or a combination.
      Another Kitchener page says this differently: “The Ontario Building Code requires us to ensure all drawings submitted are prepared and reviewed by a qualified, registered designer, architect or professional engineer.” (Apply for a building permit). Confirm before you apply: City of Kitchener, 519-741-2312.
    • Some drawings must be designed by a professional engineer when the design falls outside of the prescriptive requirements of the Building Code.
    • name and building code identification number (BCIN) of the registered firm
    • statement that the qualified person has reviewed and taken responsibility for the design activities
    • name, BCIN and signature of the qualified person
  3. Prepare your plans0 of 14

    You need an account to see these 14 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.

  4. Complete the forms6

  5. Submit your application

    You can apply for your building permit online or in person. All projects must follow our zoning bylaw.

    • Use our online services.
    • To apply for a building permit in person, please book an appointment. Please bring your completed forms and drawings to your appointment.
  6. Pay the fee

    • permit fee: $1.07 per square foot (≈ $11.52 per m²)
    • rebate fee: $500 (automatically refunded when the final building inspection is approved)
    • development charges
    • Other fees such as a damage deposit fee and a stormwater management fee may apply.

Written from Kitchener’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice

No document open

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.