1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

Permit guideKitchenerBuilding PermitsSheds & Accessory Buildings

Shed permits

You need a building permit to build a shed that is more than 161 square feet (≈ 15 m²), more than one storey, attached to another structure, used for any purpose other than storage, or has plumbing.

From Kitchener’s own pages, checked Oct 2026.

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

  1. Check whether you need a permit

    • more than 161 square feet (≈ 15 m²)
    • more than one storey
    • attached to another structure
    • used for any purpose other than storage
    • contains plumbing
    No building permit

    You don't need a building permit for building a shed that meets all of these criteria:

    • smaller than 161 square feet (≈ 15 m²) in gross area
    • one storey in building height
    • not attached to a building or any other structure
    • used only for storage purposes ancillary to a principal building on the lot
    • does not have plumbing
  2. Only if the proposed shed is larger than 592 square feet (≈ 55 m²)

    Sheds larger than 592 square feet: a qualified designer

    Qualified designers

    Qualified designers need to include their:

    • name
    • BCIN #
    • designer statement
    • signature on the plans
    • completed schedule 1 form
  3. Read the process guide

    • process guide - shed
  4. Check the drawing requirements

    • be fully dimensioned - elevation and construction floor plans shall be drawn to scale: min. 1:75 or 3/16” = 1’
    • note all sizes and types of construction materials that will be used, as well as the locations of these materials
    • note finishes to all walls, ceilings and floors
    • all existing and proposed fire separations
  5. Prepare your plans0 of 8

    You need an account to see these 8 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.

  6. Complete the forms2

  7. Submit your application

    You can apply for your building permit online or in person. All projects must follow our zoning bylaw.

    • Use our online services.
    • To apply for a building permit in person, please book an appointment. Please bring your completed forms and drawings to your appointment.
  8. Pay the fee

    • permit fee: $95 per shed

Written from Kitchener’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice

No document open

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.