1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

Permit guideKitchenerPlanning ApplicationsSite Plan

Site plan applications

For major development projects and changes to sites that fall under Site Plan Control, the City asks you to prepare a site plan.

From Kitchener’s own page, checked Oct 2026.

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

  1. Check whether you need a site plan

    • constructing a new building or addition
    • undertaking major renovations that increase the size or usability of a building
    • creating a commercial parking lot
    • making alterations to an already approved site plan
    • building massing, conceptual design and location
    • on-site amenities, landscaping and lighting
    • driveways, vehicle circulation and parking
    • sustainability features
    • grading and stormwater management
    • sewer and water lines
    When you don’t need a site plan

    You don’t need to give us a site plan for these projects:

    • a residential building on a parcel of land containing a total of 10 residential units or less
    • farm building
    • For these projects, you may still need a building permit or site alteration permit.
  2. Pre-submission consultation

    • We suggest a pre-submission consultation for Full Site Plan applications and some Stamp Plan A applications.
    • Call us at 519-741-2426 or send us an email to confirm if you request a consultation.
    • During this meeting, we’ll share information that will help with your specific application.
  3. Download the application form3

    Choose the application form that fits your project:

  4. Digital submission resources

    • site plan title block instructions
    • standard title block file
    • parkland dedication plan template
  5. Send the application by email

    • Send the completed application form and any attachments, including a scan of the cheque, to us by email.
    • If your application is larger than 10 MB, please contact us to arrange for a file transfer.
  6. Mail or courier the application to City Hall

    • The original, signed application form and cheque should be couriered as soon as possible after sending your application by email.
    • Send applications to: City of Kitchener Manager of Development Review - Planning division 200 King Street West Kitchener, ON N2G 4R6
  7. Staff review

    • We circulate your application to internal staff and agencies.
    • Staff share comments with you.
    • If required, review includes a Site Plan Reviewing Committee meeting within 30 days of application.
  8. Conditional approval

    • If appropriate, we’ll approve your application with conditions.
    • Before final approval, you’ll need to meet those conditions.
  9. Applicant meets conditions

    • You’ll submit the plans, studies and reports outlined in your conditional approval.
    • Staff will review your documents and share their clearance with planning staff.
    • At this stage, you can start applying for building permits, but we won’t issue them until you get final approval.
    • list of conditions for site plan approval
    • example Section 41 agreement
    • on-site works cost estimate (Excel file)
    • performance securities for site development works
  10. Final approval

    • After all conditions are cleared and you have paid any site securities or fees, we will issue final approval.
    • The development agreement (if applicable) will be registered on the title of the property.
    • We issue building permits after a site plan gets final approval from staff.

Written from Kitchener’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice

No document open

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.