1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

Permit guideKitchenerSite Alteration & EngineeringRoad Occupancy & Encroachment

Road occupancy or work permits

You need a work permit to occupy or close any city road, sidewalk or boulevard to conduct work or other activities.

From Kitchener’s own pages, checked Oct 2026.

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

  1. Check whether you need a permit

    • You need a work permit to occupy or close any city road, sidewalk or boulevard to conduct work or other activities.
    • No work may take place on any portion of a city right-of-way without a valid permit.
    • Non-compliance may result in enforcement and issuance of fines.
    • For a permit on a regional road in Kitchener, please apply through the Region of Waterloo.
    • Download the full regional road listing.
  2. Only if property projects require vehicles or equipment to be brought to the property through City parks, walkways, or trails

    Add an access over City property permit, if needed

    When you need an AOCP permit

    • Renovations, extensions, pool or fence installations/removals, backyard landscaping, or any other property projects that require vehicles or equipment to be brought to the property through City parks, walkways, or trails.
    • Delivery of material or supplies that requires transportation of vehicles or equipment through City parks, walkways, or trails.
    • Site investigations or research projects (that have been approved) taking place on City property requiring the transportation of vehicles or equipment through City parks, walkways, or trails.
    • Any other situation requiring equipment or vehicles transportation over City property.
    • You may also require a building permit or a regional work permit.

    Who can apply?

    • Homeowners wishing to transport equipment and materials to their property over City parkland or trails.
    • Contractors applying on behalf of a homeowner.
    • Groups that require vehicle access to a park or trail for an approved event.

    Conditions of the AOCP permit

    • The AOCP permit is for crossing City property only. Crossing private property must be approved by the property owner before an AOCP permit will be issued.
    • Permits are for a maximum of 30 days and may be restricted to a shorter period if City operations require. Permits can be extended at the City's discretion pending damage inspections.
    • Parking of vehicles or storage of equipment and material on City property for any period of time is not allowed.
    • You are responsible for ensuring that parkland, walkway, and trail users are not put at risk due to your activities. Safe pedestrian access must always be maintained within the guidelines of the Accessibility for Ontarians with Disabilities Act and Occupational Health and Safety Act.
    • When driving on trails or parkland you should maintain a slow speed, use your flashers/beacons, stop to allow pedestrians to pass, and utilize a flagman when backing up.
    • Equipment used by you for crossing City property is restricted to being rubber tracked or wheeled and not exceeding 8,000 kg. This would include a ½ ton pickup, skid steer or mini-ex. Examples of equipment not to be used includes a single axle dump truck or larger and heavy equipment such as a grader, loader, backhoe, or concrete truck.
    • It is your responsibility to ensure the ground is completely dry before crossing.
    • Should damages occur they are the responsibility of the property owner requesting access.

    Permit Costs

    • There is no cost for acquiring an AOCP permit.
    • Damage done to City property not repaired within 30 days of the permit expiration and/or the expiry of the license, to the satisfaction of the city will be addressed by the City. You will be invoiced for the cost or repair at the going rate.
    • Note: Applications are only considered for work done between May 1st and September 30th, should the weather permit. Permits for work done outside of these dates may be approved at the City’s discretion, dependent on weather and soil conditions.
    • Note: It can take up to 10 business days for an AOCP permit to be processed. Please apply for a permit 2-4 weeks before you require it.

    Apply online

    • Apply online
  3. Only if you widen the driveway apron/boulevard beyond your property lines or cut the curb

    Add a driveway widening permit, if needed

    You need a permit to widen the driveway apron/boulevard beyond your property lines or to cut the curb. If you cut the curb or widen the driveway onto city land without a permit, you may have to pay a fine.

    Apply for a permit

    Your application must include:

    • property address
    • contractor name and contact information
    • existing and proposed width of driveway once completed
    • scaled drawing with dimensions
    • expected construction dates

    Scaled drawing

    Applications must include a scaled drawing (in metres) showing:

    • property lines
    • the house
    • existing and proposed driveway widths
    • curb cut width
    • walkway width (if applicable)
    • sidewalk and curb locations
    • visibility obstructions on either side of the driveway like fences, retaining walls, shrubs, buildings or structures that are more than 0.9 m (≈ 2 ft 11⅜ in) (3 feet (≈ 914 mm)) in height

    Distances

    Distances to:

    • hydrants
    • utility poles, guy wires and boxes
    • light posts
    • signs
    • municipal trees
    • fences, shrubs, retaining walls or other structures that are more than 0.9 m (≈ 2 ft 11⅜ in) (3 feet (≈ 914 mm)) in height

    Permit cost

    • A driveway widening permit costs $400. We refund $249 when the project is complete, making the final cost $151.
    • A deposit is required to ensure the work is completed to municipal standards and that inspections are requested. Deposits are refunded after the work has been completed, inspected and approved.

    Properties on regional roads

    • If your property is on a regional road, there may be an extra cost of $100. You will need to apply for and obtain a Regional Access Permit and Regional Work Permit. Apply for both permits through the Region of Waterloo. We will not approve a curb cut on a regional road without these permits.

    Maximum driveway width

    Contractors

    • You must hire a licensed contractor to widen your curb. If you hire a different contractor before you start the project, please let us know.
  4. Submit your application

    • five business days before the work dates requested for work outside of downtown Kitchener
    • ten business days before the work dates requested for work in downtown Kitchener
    • Apply for a work permit
    • Include a certificate of insurance as indicated in the application form.
  5. Pay the fee

    • Check our Fee Schedule under "Transportation Planning" for permit fees.
    • Fees may vary, depending on the permit, based on the duration or uses of the road.
    • Invoicing of all fees once work is completed.

Written from Kitchener’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice

No document open

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.