Finished basement permits

Finishing any portion of your basement requires a building permit.

From London’s own pages, checked Oct 2026.

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

  1. Check if your project needs a permit

    • Finishing any portion of your basement requires a building permit.
    • If you have any questions, please contact us to clarify and confirm the details of your project.
    • insulating
    • adding fixtures to the rough-ins
    • roughing in plumbing
    • changing the uses of the room(s)
    • moving/altering walls and/or openings
    • windows and doors: creating them, changing them, enlarging or altering them
    • stairs; moving, changing, rebuilding
    • foundation: anything that cuts, alters or involves the foundation
    • Electrical work may require a permit from the Electrical Safety Authority (ESA) and is not issued by the City of London. The ESA has resources to help you contact a local professional electrician.
  2. Check the City's list of projects that need a permit

    You need a permit before you start building, demolishing, or installing any of the following:

    • Basement: Excavating to increase headroom
    • Basement: Below-grade entrance or basement walkout
    • Basement: Basement apartment (second unit)
    No permit needed

    Projects that do not require a permit:

    • Damp-proofing a basement
  3. Connect with the Building team

    • Email the Building team to discuss the requirements for your project. They can provide guidance, detailed information, and a list of required materials.
    • Contact: Stormwater Engineering at stormwater@london.ca for a copy of the lot grading plan for the area to ensure your project will not affect drainage on your property or neighbouring properties. These are typically available for residential properties built after 1975.
  4. Review zoning regulations

    • Before you start, check the City of London’s zoning bylaw. This will show if there are any restrictions on what you can build on your property.
    • Schedule a meeting with a Zoning Coordinator to ensure you're complying with the City of London Zoning By-law.
  5. Understand costs and timelines

    Make sure you know how much a building permit will cost and how long it will take to get it.

    • When you apply for a permit, you'll pay a deposit. This deposit will go towards your total permit cost. The City will calculate the final amount once your permit is ready to be issued.
    • Minimum permit fee: The minimum fee is $260.37
    • Additional fees: You may need to pay extra fees, like development charges or additional permit fees, before your permit is finalized.
    • Fee details: For more information on fees for different types of projects, check the Building B-7 By-law.
    • Permits for new homes, additions, and renovations (including single detached, semi-detached, cluster single detached, and townhouses): 10 Business Days
    • These provincially mandated timeframes begin once an application is deemed complete.
  6. Prepare your documents0 of 4

    You'll need different forms, drawings, and documents based on your project type.

    You need an account to see these 4 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.

  7. Complete the forms2

  8. Prepare your files

    • While homeowners may submit their own plans, the drawings must clearly show all necessary details, including materials, sizes, spans, and dimensions, to meet the minimum code requirements. It is recommended to use a professional designer, as this can often result in faster approval times.
    • File format: Save all files as PDF. Secure or protected PDFs will not be accepted.
    • Color and orientation: Use greyscale and landscape orientation.
    • Individual files: Upload each drawing type as a separate file.
  9. Check for additional approvals

    Depending on your project and property location, you may need extra approvals before you can get your building permit. Here are some common ones:

    • Conservation authority approval: If your property is regulated by a conservation authority, like the Upper Thames River Conservation Authority, you'll need their approval.
    • Heritage approval: If your property is a listed or designated heritage site, you’ll need heritage approval.
    • Ontario Ministry of Transportation approval: For properties in MTO-controlled areas, you’ll need approval from the Ontario Ministry of Transportation.
    • Site plan approval: If your property is in a site plan control area, you’ll need site plan approval. For details, email plandev@london.ca.
    • Tree removal permit: If you plan to remove or damage trees on public or private property, you might need a tree removal permit.
    • Committee of adjustment approval: If your project doesn’t meet current zoning by-law requirements, you might need approval from the Committee of Adjustment.
  10. Submit your application

    Follow these simple steps to apply online through our Development & Business Portal.

    • Create an account: Set up an account to access our online Development and Business Portal. This will allow you to manage your application and track its progress.
    • Submit your application: Log in to the Development and Business Portal and click the “Add New Permit” button to begin your application. Follow the steps to enter the required information, download the necessary documents, and pay the applicable fee.

Written from London’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice