Permit guideLondonBuilding PermitsDecks & Porches
Deck permits
Your deck may or may not require a building permit: side and rear decks less than 600 mm (≈ 1 ft 11⅝ in) (24”) above grade will require a permit if attached to the house, and do not require a permit if not attached to the house.
The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →
Check if your project needs a permit
Your deck may or may not require a building permit. Side and rear decks less than 600 mm (≈ 1 ft 11⅝ in) (24”) above grade:
- will require a permit, If it is attached to the house.Another London page says this differently: “Deck: Greater than 0.61 meters (≈ 2 ft) (2 feet (≈ 610 mm)) high.” (Before you apply for a building permit). Confirm before you apply: Path2Approval, 519-661-4555.
- does not require a permit, if it is not attached to the house
- If your deck is attached to the house and a building permit has been issued an excavation/footing inspection will be required in addition to the final inspection.
- will require a permit, If it is attached to the house.
Connect with the Building team
- Email the Building team to discuss the requirements for your project. They can provide guidance, detailed information, and a list of required materials.
- Contact: Stormwater Engineering at stormwater@london.ca for a copy of the lot grading plan for the area to ensure your project will not affect drainage on your property or neighbouring properties. These are typically available for residential properties built after 1975.
Review zoning regulations
The zoning by-law outlines the specific regulations for deck locations
- Decks may encroach up to 3 metres (≈ 9 ft 10⅛ in) (9-10 feet (≈ 3.05 m)) into the required yard setbacks, but must always remain at least 1.2 metres (≈ 3 ft 11¼ in) (3 -11 feet (≈ 3.35 m)) from your property line.
- If you live beside an Open Space zone (OS4 or OS5), you must increase that to a 3 metres (≈ 9 ft 10⅛ in) (9 -10 feet (≈ 3.05 m)) setback.
- It's always best to verify the zoning around your house prior to planning your deck, to avoid costly errors. This can be done by calling 519-930-3510.
- Only if your property is in a new subdivision
New subdivisions
- Make sure you do not affect or alter the way water flows across your property.
- Do not start construction until after the subdivision is assumed.
- Property lines, grading and other alterations may change, which can affect the height and location of your deck.
- Only if the words balcony, porch, or enclosed deck (walls around your deck) better define your project
Balconies, porches and enclosed decks
- If the words balcony, porch, or enclosed deck (walls around your deck) better define your project, there are other regulations that may affect your design.
- Contact a Municipal Law Enforcement Officer prior to planning your construction to discuss the correct definition for your project and ensure the right regulations apply. Call the zoning office at 519-930-3510.
Understand costs and timelines
Make sure you know how much a building permit will cost and how long it will take to get it.
- When you apply for a permit, you'll pay a deposit. This deposit will go towards your total permit cost. The City will calculate the final amount once your permit is ready to be issued.
- Minimum permit fee: The minimum fee is $260.37
- Additional fees: You may need to pay extra fees, like development charges or additional permit fees, before your permit is finalized.
- Fee details: For more information on fees for different types of projects, check the Building B-7 By-law.
- Permits for decks, sheds, and detached garages servicing houses: 10 Business Days
- These provincially mandated timeframes begin once an application is deemed complete.
Prepare your documents0 of 10
You'll need different forms, drawings, and documents based on your project type.
You need an account to see these 10 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.
Complete the forms2
Prepare your files
- While homeowners may submit their own plans, the drawings must clearly show all necessary details, including materials, sizes, spans, and dimensions, to meet the minimum code requirements. It is recommended to use a professional designer, as this can often result in faster approval times.
- File format: Save all files as PDF. Secure or protected PDFs will not be accepted.
- Color and orientation: Use greyscale and landscape orientation.
- Individual files: Upload each drawing type as a separate file.
Check for additional approvals
Depending on your project and property location, you may need extra approvals before you can get your building permit. Here are some common ones:
- Conservation authority approval: If your property is regulated by a conservation authority, like the Upper Thames River Conservation Authority, you'll need their approval.
- Heritage approval: If your property is a listed or designated heritage site, you’ll need heritage approval.
- Ontario Ministry of Transportation approval: For properties in MTO-controlled areas, you’ll need approval from the Ontario Ministry of Transportation.
- Site plan approval: If your property is in a site plan control area, you’ll need site plan approval. For details, email plandev@london.ca.
- Tree removal permit: If you plan to remove or damage trees on public or private property, you might need a tree removal permit.
- Committee of adjustment approval: If your project doesn’t meet current zoning by-law requirements, you might need approval from the Committee of Adjustment.
Submit your application
Follow these simple steps to apply online through our Development & Business Portal.
- Create an account: Set up an account to access our online Development and Business Portal. This will allow you to manage your application and track its progress.
- Submit your application: Log in to the Development and Business Portal and click the “Add New Permit” button to begin your application. Follow the steps to enter the required information, download the necessary documents, and pay the applicable fee.
Written from London’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice