Permit guideMiltonBuilding PermitsAdditions & Alterations

Finished basement and exterior opening permits

A building permit is required in Milton before finishing any portion of a basement, and for new exterior openings, including windows, doors, egress windows, and below-grade entrances.

From Milton’s own pages, checked Oct 2026.

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

  1. Check whether you need a permit

    • A building permit is required in Milton before finishing any portion of a basement.
    • Basement renovations can affect building safety, fire protection, ventilation, insulation, and plumbing systems.
  2. Check the zoning requirements

    • Before applying, review the Zoning By-law to ensure your project complies with all applicable zoning requirements.
    • Cooking facilities are not permitted in a finished basement unless the space is approved as a secondary dwelling unit.
    • If you are planning to add a kitchen, review the basement apartment guidelines before applying.
    • Confirming zoning compliance before applying can help prevent delays during the permit review process.
  3. Only if your project includes new exterior openings, including windows, doors, egress windows, and below-grade entrances

    New exterior openings only

    A building permit is required in Milton for new exterior openings, including windows, doors, egress windows, and below-grade entrances installed on the exterior of a house or building.

    Exterior openings drawings

    Submit the following drawings with your application:

    • Site plan showing property lines, lot area, proposed openings, window wells, distances from property lines, and other structures
    • Floor plan showing all existing openings and proposed openings drawn to scale
    • Detailed page showing window and door types, dimensions, glazing, and elevation information
    • Wall section showing lintel sizes, flashing, air/vapour barrier requirements, drainage requirements, and integration with existing construction
    • Refer to the sample drawings and sample egress window drawings for specific drawing requirements, including the number of copies required.

    Exterior stairs setbacks

    For example, exterior stairs associated with a new door opening must meet required setback requirements from property lines, including:

    • Front yard setbacks
    • Rear yard setbacks
    • Side yard setbacks (interior or exterior)

    New subdivisions

    • Additional requirements may apply if your subdivision has not yet been assumed by the Town of Milton. In these cases, you must obtain a developer's clearance letter from the builder
    • To determine whether your subdivision has been assumed, call 905-878-7252 ext. 2398.

    Exterior openings fee

    Building permit fees for exterior openings are listed on the Building Permit page.

    • New opening (window or door) or side door entrance: $264.20 (flat rate)
    • Basement walkouts, exterior stairs: $264.20 (flat rate)
  4. Prepare your plans0 of 3

    Refer to the sample drawings for specific drawing requirements, including the number of copies required. Review the application guidelines before submitting your application.

    You need an account to see these 3 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.

  5. Complete the forms2

    Before you apply, gather the required forms and supporting drawings.

  6. Prepare your files

    • The application and necessary drawings and forms are required to be submitted in PDF format electronically.
    • Digital files must be in PDF format and generated directly from the software used to create them (AutoCAD, Softplan, Revit, etc.) using a PDF printer or converter (no scanned copies)
    • All PDF files must have the document properties/restrictions/security settings/permissions set to allow "Printing" and "Adding markups" so staff can apply redline notes and approval stamps to the documents
    • If you would like to send files electronically that are larger than 10MB, please contact Building Services to request a secure file link to accommodate larger file requirements.
  7. Submit your application

    Once you have gathered the required forms and construction drawings:

    • Complete the Application for a Permit to Construct or Demolish.
    • Complete the Schedule 1 – Designer Information Form, if required.
    • Submit your completed application package through the online portal, including all supporting drawings and documents.
  8. Pay the fee

    Building permit fees for finished basement projects are listed on the Building Permit page.

    • Finished basement: $6.55/m² (≈ $0.61 per sq ft) - Minimum $264.20
    • Depending on the scope of your renovation, additional fees may apply. This may include work related to new plumbing fixtures, fireplaces, windows, or doors.
    • New plumbing or alteration: $264.20 (flat rate)
    • Fireplace or woodstove: $264.20
    • Applicable fees must be paid when you submit your application.
      Another Milton page says this differently: “Once the building permit application package has been accepted, you will receive notification with an invoice for permit fees, including payment options. Permit fees are due upon receipt to begin the full permit review.” (Building Permits). Confirm before you apply: Building Services, 905-878-7252 ext 2397.

Written from Milton’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice