Permit guideMiltonBuilding PermitsDecks & Porches

Deck permits

A building permit is required in Milton if your deck is a freestanding deck greater than 10 m² (≈ 108 sq ft) in area, or attached to a building or structure.

From Milton’s own pages, checked Oct 2026.

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

  1. Check whether you need a permit

    A building permit is required in Milton if your deck is:

    • a freestanding deck greater than 10 m² (≈ 108 sq ft) in area
    • attached to a building or structure
  2. Check the zoning regulations

    Before building your deck, review the Zoning By-law to ensure your project complies with all applicable requirements. This includes regulations related to:

    • Deck height
    • Privacy screening
    • Deck location and setbacks
    • Stairs
    • Meeting zoning requirements before applying can help prevent delays during the permit review process.
  3. Only if your subdivision has not yet been assumed by the Town of Milton

    Get a developer's clearance letter, if needed

    • Additional requirements may apply if your subdivision has not yet been assumed by the Town of Milton. In these cases, you must obtain a developer's clearance letter from the builder before a permit can be issued.
    • To determine whether your subdivision has been assumed, call 905-878-7252 ext. 2398.
  4. Prepare your plans0 of 3

    Refer to the sample drawings for specific drawing requirements, including the number of copies required. Review the application guidelines before submitting your application.

    You need an account to see these 3 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.

  5. Complete the forms2

    Before you apply, gather the required forms and supporting drawings.

  6. Prepare your files

    • The application and necessary drawings and forms are required to be submitted in PDF format electronically.
    • Digital files must be in PDF format and generated directly from the software used to create them (AutoCAD, Softplan, Revit, etc.) using a PDF printer or converter (no scanned copies)
    • All PDF files must have the document properties/restrictions/security settings/permissions set to allow "Printing" and "Adding markups" so staff can apply redline notes and approval stamps to the documents
    • If you would like to send files electronically that are larger than 10MB, please contact Building Services to request a secure file link to accommodate larger file requirements.
  7. Submit your application

    Once you have gathered the required forms and drawings:

    • Complete the Application for a Permit to Construct or Demolish.
    • Complete the Schedule 1 – Designer Information Form, if required.
    • Submit your completed application package, including all supporting drawings and documents, to the online portal.
  8. Pay the fee

    Building permit fees for deck construction are listed on the Building Permit page.

    • New unenclosed deck or porch, or alteration to existing deck: $163.11 (flat rate)
    • Once the building permit application package has been accepted, you will receive notification with an invoice for permit fees, including payment options. Permit fees are due upon receipt to begin the full permit review.

Written from Milton’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice