Permit guideMiltonBuilding PermitsPools & Enclosures
Pool and hot tub enclosure permits
A pool permit is required if you plan to install a swimming pool or hot tub on your property in Milton.
The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →
Check whether you need a permit
- A pool permit is required if you plan to install a swimming pool or hot tub on your property in Milton.
- Pool enclosure requirements help protect public safety by reducing unauthorized access and ensuring pools and hot tubs are installed in accordance with applicable by-laws.
Check the zoning requirements
- Before applying, review the Zoning By-law to ensure your project complies with all applicable zoning requirements.
- The swimming pool and related equipment must meet the required setback requirements outlined in the Zoning By-law.
- Confirming zoning compliance before applying can help prevent delays during the permit review process.
Plan the pool enclosure
- The Swimming Pool Fencing By-law requires swimming pools to be enclosed by a compliant fence with controlled access points.
- Swimming Pool Fencing By-law
- Completely surround the pool area
- Include a gate with restricted entry
- Meet minimum setback requirements from property lines
- Comply with the requirements outlined in the Swimming Pool Fencing By-law
- Chain link fencing (Diagram A)
- Vertical board fencing with close rail spacing (Diagram B)
- Vertical board fencing (Diagram C)
- Ornamental iron fencing (Diagram D)
- You may use the walls of your house as part of the enclosure. All doors and window openings that provide access to the pool area must have approved safety latches or locking devices.
- Only if your subdivision has not yet been assumed by the Town of Milton
Get a developer's clearance letter, if needed
- Additional requirements may apply if your subdivision has not yet been assumed by the Town of Milton. In these cases, you must obtain a developer's clearance letter from the builder before a pool permit can be issued.
- To determine whether your subdivision has been assumed, call 905-878-7252 ext. 2398.
Prepare your site plan0 of 5
Refer to the pool enclosure permit application guide for additional application requirements. Review the drawing submission guidelines before submitting your application.
You need an account to see these 5 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.
Complete the form1
Before you apply, gather the required application information and supporting drawings.
Prepare your files
- The application and necessary drawings and forms are required to be submitted in PDF format electronically.
- Digital files must be in PDF format and generated directly from the software used to create them (AutoCAD, Softplan, Revit, etc.) using a PDF printer or converter (no scanned copies)
- All PDF files must have the document properties/restrictions/security settings/permissions set to allow "Printing" and "Adding markups" so staff can apply redline notes and approval stamps to the documents
- If you would like to send files electronically that are larger than 10MB, please contact Building Services to request a secure file link to accommodate larger file requirements.
Submit your application
Once you have gathered the required information and site plan:
- Complete the application form.
- Submit your completed application through the online portal, including all supporting drawings and documents.
Pay the fee
Pool permit fees are listed on the Building Permit page.
- Swimming pool enclosure permit (including hot tubs): $222 (flat rate)
- Applicable fees must be paid when you submit your application.Another Milton page says this differently: “Once the building permit application package has been accepted, you will receive notification with an invoice for permit fees, including payment options. Permit fees are due upon receipt to begin the full permit review.” (Building Permits). Confirm before you apply: Building Services, 905-878-7252 ext 2397.
Written from Milton’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice