Permit guideMiltonBuilding PermitsTents & Temporary Structures
Tent permits
A building permit is required for a tent that exceeds 60 m² (≈ 646 sq ft) in ground area, for two or more tents less than 3 m (≈ 9 ft 10⅛ in) from each other that exceed 60 m² (≈ 646 sq ft) in combined ground area, or for a tent attached to a building or located less than 3 m (≈ 9 ft 10⅛ in) from another structure.
The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →
Check whether you need a permit
A building permit is required for the installation of a tent where:
- A single tent exceeds 60 m² (≈ 646 sq ft) in ground area
- Two or more tents, located less than 3 m (≈ 9 ft 10⅛ in) from each other, exceed 60 m² (≈ 646 sq ft) in combined ground area
- The tent is attached to a building
- The tent is located less than 3 m (≈ 9 ft 10⅛ in) from another structure
- Only if the tent installation requires professional engineering review
Add professional engineer review, if needed
Certain tent installations require professional engineering review and supporting documentation.
Engineering requirements
Professional engineer review is required for tents that:
- Exceed 225 m² (≈ 2,422 sq ft) in ground area
- Exceed 225 m² (≈ 2,422 sq ft) in aggregate ground area and are located within 3 m (≈ 9 ft 10⅛ in) of other tents or structures
- Include bleachers
- Are enclosed with sidewalls
Prepare your plans0 of 17
Before you apply, gather the required information and supporting documents.
You need an account to see these 17 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.
Complete the forms1
Submit your application
- Complete the Application for a Permit to Construct or Demolish form.
- Submit your completed application through the online portal, including all supporting drawings and documents.
Pay the fee
- Temporary tent: $264.20 (flat rate)
- Applicable fees must be paid when you submit your application.Another Milton page says this differently: “Once the building permit application package has been accepted, you will receive notification with an invoice for permit fees, including payment options. Permit fees are due upon receipt to begin the full permit review.” (Building Permits). Confirm before you apply: Building Services, 905-878-7252 ext 2397.
Written from Milton’s own pages as published on 23 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice