Markham · Certificateswritten
Published by City of Markham under Building Permit Process
The City of Markham's test report for a sewage system that uses a pump to move sanitary sewage — used, for instance, where the distribution pipe run exceeds 150 metres, gravity flow to distribution pipes is not possible, or the design is integral to an approved treatment unit or a shallow buried trench installation. It records the pump model, tank or compartment size, the measured discharge volume and dosing time, and confirms the installation conforms to Part 8 of the Ontario Building Code, the building permit documents, and the treatment unit manufacturer's installation instructions. The supervising licensee signs.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.