1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

Permit guideOakvilleBuilding PermitsHouses

New house permits

Constructing a new home needs a building permit and requires coordination of multiple approvals from the town and other agencies.

From Oakville’s own pages, checked Oct 2026.

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

  1. Check whether you need a permit

    A permit is required prior to building, renovating, demolishing or installing any of the following:

    • Any building or structure which is greater than 10 square metres (≈ 108 sq ft) or any size building that contains plumbing
  2. Before preparing your permit

    Some approvals and permits must be in place before you start preparing your building permit application.

    • Contact the Ontario Dig Authority 1-800-400-2255 before you dig to locate underground utilities and avoid damage during construction.
    • For electrical work, contact the Electrical Safety Authority (ESA) at 1-877-372-7233 or eas.cambridge@electricalsafety.on.ca
    • Demolition permit: If you plan to demolish an existing structure, you will require a separate demolition permit. A demolition permit is a type of building permit.
    • Accessory apartment: If you plan to create a separate dwelling unit, please refer to the Accessory Apartment page for additional requirements.
    • Site plan approval: You must submit an application for site plan approval if there is a severance of the property.
    • Adding a pool
    • Adding a retaining wall
    • Widening a driveway
  3. Project preparation

    Detailed information is needed to properly evaluate your plans and the unique conditions of your property:

    • Before you get started, consult the zoning by-law to ensure your house plans, proposed dimensions and location are permitted under the Town of Oakville's zoning by-laws which regulate the use, shape and location of buildings on properties.
    • Visit our Zoning page or contact us at 905-845-6601 ext. 3955.
    • If your project includes excavation and your property backs onto green space, a river bed or wetland you will need Conservation Halton approval.
    • Contact Conservation Halton for approval at web@hrca.on.ca or 905-336-1158.
    • For new service connections including water service, water meter and sanitary connections contact the Region of Halton at pwpermits@halton.ca or 905-825-6000.
    • Development and other charges such as cash in lieu of parkland dedication are payable on severed lots and vacant properties.
    • Contact Development Finance at developmentfinance@oakville.ca or visit our Development Charges page.
  4. Prepare your plans0 of 9

    Digital copies of drawings and documents are required, scaled to size and flattened. If preparing the documentation is beyond your comfort level or experience, we recommend working with a Building Code (BCIN) qualified designer, architect or engineer.

    You need an account to see these 9 items.It’s free. Use Sign in at the top of the page to create one, then tick the items off on any device and print them as a checklist.

  5. Complete the forms6

  6. Submit your application

    • Review and complete the Applicable Law Form to indicate which additional approvals may be required for your project. Save this form and be sure to upload it as a supporting document during the application process.
    • If it is your first time using our online services, you need to create a user name and password. If you have an existing account, you can use the same username and password.
    • Provide information about your project and upload your drawings and documents. You do not need to provide the Application for a Permit to Construct or Demolish.
    • Name your file using the short form name or a brief label so that the content of the document is clear.
    • Save files in Vector PDF format, unlocked/editable, greyscale, flattened into a single layer and free of comments.
    • The review and approval process of your submitted documents regarding your building permit application will be processed through the ePlan, powered by ProjectDox software, if your application requires drawings to be uploaded.
  7. Pay the fee

    • The total fees depend on the size, type and use of the proposed project or building. The exact cost of your permit will be calculated once we pre-screen your request.
    • The minimum fee for a building permit is $200.
    • You will be prompted to pay a $100 pre-screening fee when you submit your request online. This non-refundable deposit will be credited towards the total cost of your permit. Subsequent resubmissions are subject to the non-refundable pre-screen fee.
    • Building Services - Rates and Fees
    • There may be additional fees such as development charges or deposits you need to pay before your permit is issued.
    • Once your application is accepted, you will receive an invoice for payment.
    • Credit card up to $10,000 payable by signing into your town account
    • Email transfer up to $10,000 through your financial institution to buildingrequests@oakville.ca
    • Electronic funds transfer (EFT) in any amount with direct payment to the Town of Oakville's bank account.
    • Cheques are still accepted made payable to the Town of Oakville, and mailed or delivered to:
    • Town of Oakville Attn: Building Services 1225 Trafalgar Road Oakville, ON L6H 0H3

Written from Oakville’s own pages as published on 22 October 2026. The municipality decides what a permit needs: confirm with it before you apply. Legal notice

No document open

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.