BramptonSite Alteration & EngineeringRoad Occupancy & Encroachment

Application Process for Driveway Widening/Curb Cuts

Published by City of Brampton

This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Form
Published by
City of Brampton
Also called
Driveway Widening Permit
For
homeowner
Building types
All building types
Pages
2
Agencies
Peel Land Registry Office
Submit to
Public Works & Engineering, Williams Pkwy Operations Centre, 1975 Williams Pkwy
Covers note
Two pages under the same process title and departmental mastheads; the content runs as bulleted process notes and fill-in lines rather than titled sections.
Instruments
Municipal Act, S.O. 2001, s. 25 · City of Brampton By-law 93-93

Overview

Brampton's two-page driveway widening and curb cut package, linked as Driveway Widening Permit on the City's Applications page. The first page, from Zoning Services at the Flower City Community Campus, sets out the route: a zoning compliance review with the legal lot survey, then review by Public Works & Engineering at the Williams Pkwy Operations Centre, a site inspection, and a $50.00 non-refundable Road Occupancy and Access permit on approval. The second page collects owner and property details and the four measurements in its diagram.

What it covers

  • Application Process for Driveway Widening/Curb Cuts
  • Zoning Services, Building Division
  • Public Works & Engineering
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Application Process for Driveway Widening/Curb Cuts

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.