LondonPlanning ApplicationsSubdivisions & Condominiums

Design Review Process

Published by City of London

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of London’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of London
Also called
Design Review Process Guideline
For
designer
Building types
All building types
Pages
7
Agencies
Subdivision Engineering · Geomatics Division
Submit to
subscondosubmissions@london.ca
Instruments
Design Specifications and Requirements Manual · Site Alteration By-law

Overview

The City of London's Design Review Process, a Path 2 Approval guideline from Subdivision Engineering. It covers the stages after draft plan approval: the Design Studies package and its completeness review, preliminary comments and the external review meeting, then the Detailed Design Review first submission with its manifest, drawings and fees, and review timelines. A closing section lists other processes, such as site alteration. It follows the draft approval guideline and refers to the Design Specifications and Requirements Manual.

What it covers

  • Design Review Process
  • Design Studies
  • Detailed Design Review
  • Summary of Design Study process
  • Other Processes
  • Site Alteration Process within Detailed Design Review
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Design Review Process

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.