1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

LondonPlanning ApplicationsSubdivisions & Condominiums

Subdivision Drawing Review 1st Submission Manifest

Published by City of London

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of London’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Document
Published by
City of London
Date
Revised 2026
For
designer
Signed by
Engineer
Building types
All building types
Pages
7
Agencies
Upper Thames River Conservation Authority · UTRCA

Overview

The City of London Planning and Development's seven-page Subdivision Drawing Review 1st Submission Manifest, revised 2026. After a cover page on the subdivision approval process, it collects subdivision, owner and engineering consultant information. Section A covers draft plan and file manager approvals; Section B lists reports, drawings and design studies for a complete first submission, including servicing reports, plans and digital copies. It is filed with a subdivision's drawing review package.

What it covers

  • Subdivision Approval Process
  • SUBDIVISION INFORMATION
  • OWNER/DEVELOPER INFORMATION
  • ENGINEERING CONSULTANT INFORMATION
  • SECTION A
  • DRAFT PLAN &FILE MANAGER APPROVALS
  • SECTION B
  • Requirements for a Complete 1st Submission
  • Drawing Review Fees
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Subdivision Drawing Review 1st Submission Manifest

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.