1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

MiltonPlanning ApplicationsPre-consultation

Terms of Reference: Site Servicing, Drainage and Grading Plan

Published by Town of Milton

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the Town of Milton’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Study
Published by
Town of Milton
Date
January 2023
Also called
Site Servicing, Drainage and Grading Plans
For
designer
Building types
All building types
Pages
4
Agencies
Conservation Halton · Halton Region
Instruments
Engineering and Parks Standards Manual (2019)

Overview

The Town of Milton's three-page terms of reference for a Site Servicing, Drainage and Grading Plan, dated January 2023. It describes plans that show how a development connects to neighbouring lands and demonstrates water, wastewater and stormwater serviceability. It covers who prepares and stamps the plan, the applications it may accompany, why the Town asks for it, notes on unassumed subdivisions and Regional roadways, and a resource list that includes the Engineering and Parks Standards Manual and Conservation Halton's mapping.

What it covers

  • What is the purpose of this?
  • Who should prepare this?
  • When is this required?
  • Why do we need this?
  • What else should we know?
  • What other resources are there?
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Terms of Reference: Site Servicing, Drainage and Grading Plan

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.