BramptonSite Alteration & EngineeringSite Alteration
Published by City of Brampton
This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The City of Brampton's lot grading guidelines on residential surface drainage, written for property owners. It explains how swales, catch basins, eavestroughs, downspouts and window wells carry water off a lot, defines ponding and positive drainage, and gives the 48-hour drying test for normal drainage. It describes what a lot grading plan records, from design elevations to rear lot catch basins, works through common drainage problems between neighbours, and closes with site alteration permits and contacts. It gathers the content of the City's two drainage fact sheets.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.