1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

KitchenerBuilding PermitsAdditional Residential Units

Kitchener Utilities Additional Dwelling Unit (ADU) Guide: Water and Gas Services

Published by City of Kitchener

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of Kitchener’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Kitchener
Also called
water and gas servicing/metering guide for additional meters
For
owner
Building types
All building types
Pages
3
Agencies
Kitchener Utilities · TSSA
Instruments
Conditions of Service · City of Kitchener User Fee Schedule

Overview

Kitchener Utilities' Additional Dwelling Unit (ADU) Guide to water and gas services, linked from the City of Kitchener's residential building permit page. It describes water service size, three ways to meter water separately, gas service size and one multi-meter location per property, gas meter requests, unit numbering for meter tags, and contact points. It is a utility guide rather than a building division form, and it relates to Kitchener's additional dwelling unit permit documents.

What it covers

  • Water Services
  • Water Meters
  • Dual City Meters
  • City Meter Room
  • City Meter installed with Private Meter
  • Remotes
  • Gas Services
  • Gas Meters
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Kitchener Utilities Additional Dwelling Unit (ADU) Guide: Water and Gas Services

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.