MarkhamPlanning ApplicationsEvery planning application

Applicant Guide Stage 1 – Preliminary/Conceptual Review

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
June (2026)
Also called
Applicant Guide for Stage 1 – Official Plan Amendment (OPA), Zoning By-law Amendment (ZBA) and Draft Plan of Subdivision (SU) applications
For
designer
Building types
All building types
Pages
3

Overview

The City of Markham Design Review Panel's applicant guide for Stage 1, the preliminary or conceptual review of Official Plan Amendment, Zoning By-law Amendment and Draft Plan of Subdivision applications, updated June 2026. Its three pages hold a project data block, a note on the panel and the projects it reviews, submission package timing, the conceptual materials asked for (context plans, site plan, elevations with angular plane analysis, massing, landscape, phasing and sun and shadow analysis), the 10-minute presentation, what follows the meeting, and the coordinator's contact.

What it covers

  • General Project Data
  • The Design Review Panel (DRP)
  • Applicant Submission Package Materials
  • Submission Requirements
  • Presentation
  • What to Expect After the DRP Meeting
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Applicant Guide Stage 1 – Preliminary/Conceptual Review

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.