Quick Reference – Shop Drawing Review

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
May 2023
Also called
Shop Drawing Review
For
contractor
Building types
All building types
Pages
2

Overview

The City of Markham Building Standards Department's two-page ePLAN Quick Reference for shop drawing review submissions, dated May 2023 and listed on the ePLAN Guides & Tutorials page. It explains when a separate review applies (shop drawings not approved in the issued permit drawings), the settings for a new application under Non-Housing Permits, the project description, the temporary SD folder number later tied to the building permit, the 10-business-day target review timeline, and the drawing and document standards, including hydraulic calculations with sprinkler or standpipe submissions.

What it covers

  • When are shop drawing reviews required?
  • Detailed Information of New Application
  • Project Description
  • Folder Number
  • Submission Requirements
  • Drawings
  • Documents
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Quick Reference – Shop Drawing Review

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.