MississaugaPlanning ApplicationsPart Lot Control

Exemption from Part Lot Control (PLC) Fee Calculation Worksheet

Published by City of Mississauga

This is the City of Mississauga’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Fees
Published by
City of Mississauga
Date
Rev. 2025 12
Also called
Exemption from PLC Fee Calculation Worksheet
Form reference
Form 2800
For
owner
Building types
All building types
Pages
1
Instruments
Planning Act Processing Fees By-law

Overview

Mississauga's one-page fee worksheet for an application for exemption from part-lot control, Form 2800, revised December 2025. It adds a $2,074 base fee per application to a $71 variable rate for each semi-detached, townhouse or industrial lot or block created, giving a total application fee. Its notes point to the Planning Services Centre of the Development and Design Division and the eplans.devdes@mississauga.ca address for checking the calculation, mention possible legal services fees on registration, and defer to the Planning Act Processing Fees By-law. It accompanies the City's Form 2799 application.

What it covers

  • Fee Calculation
  • Notes
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Exemption from Part Lot Control (PLC) Fee Calculation Worksheet

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.