Building Permit Requirements: Back Flow Prevention Device

Published by City of Brampton

This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Brampton
Date
Revised: Feb 2026
Also called
Back Flow Prevention Device
For
designer
Signed by
designer · architect · professional engineer · applicant
Building types
All building types
Pages
4
Agencies
Region of Peel
Instruments
Region of Peel By-law 10-2017 · Ontario Building Code · Building Code Act, S.O. 1992, c.23 · City of Brampton By-law 387-2006

Overview

The City of Brampton Building Division's package for a back flow prevention device permit in new buildings and retrofits other than a house under 600m2 and three storeys, bundling the requirements sheet with Schedule 1: Designer Information, the Commitment to Provide General Review and the applicable law checklist. The sheet points to the Region of Peel back flow prevention program under by-law 10-2017, and lists the surveyor's analysis, key plan, floor plan locating water meter, preventers and expansion tanks, schematics, and $73.47 per device with a $444.85 minimum.

What it covers

  • Building Permit Requirements
  • Back Flow Prevention Device
  • Note to Applicant
  • Building Permit Application
  • Building Permit Issuance
  • Schedule 1: Designer Information
  • A. Project Information
  • B. Individual who reviews and takes responsibility for design activities
  • C. Design Activities Undertaken by Individual Identified in Section B.
  • D. Declaration of Designer
  • Commitment to Provide General Review
  • Project Information
  • Property Owner
  • For Office Use Only
  • Section GI. Documents Establishing Compliance with Applicable Law (OBC Div. A - 1.4.1.3.)
  • Applicable Laws
  • Applicant's Declaration
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Building Permit Requirements: Back Flow Prevention Device

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.