BramptonBuilding PermitsPlumbing & Drains
Published by City of Brampton
This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The City of Brampton Building Division's package for a back flow prevention device permit in new buildings and retrofits other than a house under 600m2 and three storeys, bundling the requirements sheet with Schedule 1: Designer Information, the Commitment to Provide General Review and the applicable law checklist. The sheet points to the Region of Peel back flow prevention program under by-law 10-2017, and lists the surveyor's analysis, key plan, floor plan locating water meter, preventers and expansion tanks, schematics, and $73.47 per device with a $444.85 minimum.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.