BramptonBuilding PermitsPlumbing & Drains
Published by City of Brampton
This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The City of Brampton Building Division's homeowner package for connecting a house to new municipal water or sanitary sewer services, bundling the requirements sheet with Schedule 1: Designer Information, the applicable law checklist and a sample site plan. The sheet lists a site plan and legal survey locating existing buildings, wells and septic systems, a service drawing giving pipe length and material from the property line to the house, whether a well will be abandoned, and the $326.21 fee for the standard 10 day permit application service.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.