BramptonBuilding PermitsPlumbing & Drains
Published by City of Brampton
This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
A single-page card from the City of Brampton Building Division on which a plumbing contractor draws the drain plan as installed. It heads with the permit, lot and plan numbers and the municipal address, and takes the contractor's name, licence number, address, phone and signature. Outside inspector and inside inspector approval lines with dates follow. Three testing procedures are listed: a ball test on outside sewers, water and ball testing on inside building drains, and water service at 102 p.s.i. air or 145 p.s.i. hydrostatic for one hour.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.