MarkhamSite Alteration & EngineeringSite Alteration
Published by City of Markham
This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The City of Markham's certificate confirming that an infill residential lot has been graded and drained as approved. Addressed to the Chief Building Official under Division B, Sentence 9.14.6.1.(1) of the Ontario Building Code, it follows a field review of the final grades and certifies that grading and drainage match the plan reviewed by Markham Development Engineering, that the site has been fully stabilized with sod or other ground cover, and that neighbouring properties are not adversely affected. The grading consultant signs and affixes a seal.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.