MarkhamSite Alteration & EngineeringSite Alteration
Published by City of Markham
This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
Section L, Site Alteration, of the City of Markham Engineering Department's Design Criteria, dated August 2012 (Rev. 1) and linked from the City's Site Alteration Permit (SALT) page. It sets out erosion and sediment control for Site Alteration Plans at each construction stage, including sediment basins, catchbasin sediment control, sediment and tree preservation fences, topsoil stockpiles, mud mats and check dams; dust control measures and construction practice guidelines; site alteration permit processes with and without a site plan or subdivision application; and the TRCA erosion control checklist.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.