1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

KitchenerBuilding PermitsCommercial, Industrial & Institutional

High Building (OBC 3.2.6. and SB-4) Design Checklist for New Buildings

Published by City of Kitchener

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of Kitchener’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Checklist
Published by
City of Kitchener
Date
March 2025
Also called
high building (OBC 3.2.6. and SB-4) design checklist for new buildings
For
designer
Signed by
Architectural · Mechanical Systems · Electrical Systems · Structural Systems · Project Code Consultant
Building types
All building types
Pages
6
Instruments
Subsection 3.2.6. of the Ontario Building Code · SB-4 of the Supplementary Standards

Overview

The City of Kitchener Building Division's six-page High Building (OBC 3.2.6. and SB-4) Design Checklist for New Buildings, created March 2025. The design team lists its disciplines, then the sheets set out Subsection 3.2.6. and Supplementary Standard SB-4 items with Remarks lines: smoke movement, stair shafts, elevators and firefighter elevators, venting, the central alarm and control facility, voice communication and testing. It is read with the permit drawings and the building code matrix.

What it covers

  • Purpose of Checklist
  • Design Team Confirming and/or Detailing OBC Compliance for High Building Measures
  • Checklist Instructions
  • High Building Requirements
  • Limits to Smoke Movement
  • Stairway Protection Below Lowest Exit Level
  • Requirements for Stair Shafts Serving Storeys Above Lowest Exit Level
  • Limiting Smoke Movement into Storeys Above Lowest Exit Level
  • Air Moving Fans
  • Group C Public Corridor Make Up Air
  • Connected Buildings
  • Emergency Operation of Elevators
  • Elevator for Use by Firefighters
  • Venting to Aid Firefighting
  • Central Alarm and Control Facility (CACF Room)
  • Voice communication Systems
  • Testing
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

High Building (OBC 3.2.6. and SB-4) Design Checklist for New Buildings

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.