1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

KitchenerBuilding PermitsEvery building permit

Flow Control Roof Drainage Declaration

Published by City of Kitchener

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of Kitchener’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Form
Published by
City of Kitchener
Date
March 14, 2023
Also called
flow control roof drainage declaration
For
designer
Signed by
Mechanical Engineer · Structural Engineer
Building types
All building types
Pages
1
Agencies
OAA · PEO · Ontario Building Officials Association

Overview

A one-page Flow Control Roof Drainage Declaration, last revised March 14, 2023, which Kitchener lists among its building permit forms. The sheet is marked as an EABO standard form endorsed by the OAA, PEO and the Ontario Building Officials Association. A mechanical engineer's part offers options M1 to M3 for conventionally drained or flow control roof drains, and a structural engineer's part offers S1 and S2 on rain and snow loads, each with a seal.

What it covers

  • Professional Seal Applied By
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Flow Control Roof Drainage Declaration

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.