Also from BlinKode: CodeEase →
KitchenerBuilding PermitsEvery building permit
Published by City of Kitchener
The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →
This is the City of Kitchener’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
A one-page Flow Control Roof Drainage Declaration, last revised March 14, 2023, which Kitchener lists among its building permit forms. The sheet is marked as an EABO standard form endorsed by the OAA, PEO and the Ontario Building Officials Association. A mechanical engineer's part offers options M1 to M3 for conventionally drained or flow control roof drains, and a structural engineer's part offers S1 and S2 on rain and snow loads, each with a seal.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.