1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

KitchenerPlanning ApplicationsPlanning guidelines

Sun & Shadow Study

Published by City of Kitchener

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of Kitchener’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Study
Published by
City of Kitchener
Also called
Sun-shadow Study
For
designer
Building types
All building types
Pages
4
Instruments
Urban Design Manual

Overview

The City of Kitchener's terms of reference for a Sun & Shadow Study, a graphic analysis of shadows cast by a proposed development. It lists the applications it relates to for buildings of 8 storeys (25 metres) or higher, the qualified professionals, title block items, massing model contents, time zones, coordinates, test dates and hourly times, policy context, evaluation criteria and results summary. It is one of Kitchener's planning study terms of reference.

What it covers

  • Sun & Shadow Study
  • Study Description
  • Purpose
  • When is it Required
  • Qualified Person
  • Applicable Legislation
  • Study Requirements
  • Report Contents
  • Massing Model
  • Required dates and times
  • Policy Context
  • Evaluation Criteria
  • Summary of Results and Recommendations
  • Additional Information
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Sun & Shadow Study

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.