BramptonBuilding PermitsAdditions & Alterations
Published by City of Brampton
This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The City of Brampton Building Division's factory built fireplace package for a zero clearance unit, separate from its masonry fireplace and chimney package. Its requirements sheet lists a property survey showing the chimney, a floor plan with the fireplace and its distance from adjacent walls, a section showing the smoke pipe, chimney height above the roof and chimney support, and the manufacturer's specifications, returned with the permit. It names CAN/ULC S610-M, Factory-Built Fireplaces, and a $326.21 fee. Schedule 1 and the applicable law checklist follow.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.