1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

LondonBuilding PermitsEvery building permit

Integrated Systems Testing Permit Submission Guide

Published by City of London

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of London’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of London
Also called
Integrated systems testing
For
designer
Building types
All building types
Pages
1
Instruments
CAN/ULC-S1001 · Ontario Building Code 2024

Overview

The City of London's Integrated Systems Testing Permit Submission Guide, a one-page document based on CAN/ULC-S1001 (2011 Edition) and the Ontario Building Code 2024. It sets out the general items for the integrated testing coordinator, such as qualifications, standards, report format and completion, and the information for a permit submission, including the coordinator form and the testing plan. London's maglock guide points to the same coordinator form.

What it covers

  • General Requirements
  • Required Information
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Integrated Systems Testing Permit Submission Guide

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.