1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

LondonBuilding PermitsEvery building permit

Integrated Testing Coordinator (ITC) Information

Published by City of London

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of London’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Form
Published by
City of London
Also called
Integrated Testing Coordinator (ITC)
For
designer
Building types
All building types
Pages
2
Agencies
Housing and Community Growth · Building Controls
Submit to
The Corporation of the City of London, Building Controls
Instruments
Ontario Building Code (OBC) 2024 · CAN/ULC-S1001

Overview

A two-page form from the City of London's Housing and Community Growth for a building permit that involves integrated systems testing. Page one gives the coordinator's name, firm and contact details, the permit address and a checklist of the fire protection and life safety systems being integrated under the Ontario Building Code 2024. Page two is the declaration, offering a professional engineer licensed in Ontario or a ULC listed individual, and describes the integrated testing report that follows construction.

What it covers

  • Integrated Testing Coordinator (ITC) Information
  • Declaration
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Integrated Testing Coordinator (ITC) Information

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.