Brampton · Forms and scheduleswritten

Schedule 1: Designer Information

Published by City of Brampton under A Zindex

Alias
Schedule 1 - Designer Information
Form ref
Building Code Table 3.5.2.1. of Division C
Applies to
designer
Work types
any

The City of Brampton's Schedule 1, used once for each individual who reviews and takes responsibility for design activities on a project. It records that individual's firm and contact details, the design activities undertaken under Building Code Table 3.5.2.1. of Division C — house, small, large and complex buildings, HVAC, plumbing, building structural, building services, detection, lighting and power, fire protection and on-site sewage systems — and a declaration of firm registration, qualification as an other designer, or exemption, with individual and firm BCINs.

What it covers

  • Schedule 1: Designer Information
  • A. Project Information
  • B. Individual who reviews and takes responsibility for design activities
  • C. Design activities undertaken by individual identified in Section B.
  • D. Declaration of Designer
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Brampton
Category
Forms and schedules
Published under
A Zindex — the municipality's own heading
Instruments
Building Code, Division C, subsection 3.2.4. · Building Code, Division C, subsection 3.2.5.
Signatories
designer
Required for
Each individual who reviews and takes responsibility for design activities
Document date
Apr 2026
Document date display
April 2026
Tags
formscheduledesigner-informationbcin
Schedule 1: Designer InformationOpen at brampton.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.