MiltonPlanning ApplicationsSite Plan

Site Plan Approval Guidelines

Published by Town of Milton

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the Town of Milton’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
Town of Milton
Date
January 2023
Also called
Site Plan Guidelines
For
designer
Building types
All building types
Pages
30
Agencies
Accessibility Advisory Committee · Development Services Department
Instruments
Planning Act · Provincial Policy Statement

Overview

The Town of Milton's 30-page Site Plan Approval Guidelines, dated January 2023, in two parts. Part A, Process and Procedures, covers the overview of site plan approval, the two-stage pre-application process, the application, submission, scope and fees, financial requirements, and review through to final approval, extensions, site inspection, security release and inactive applications. Part B, Design Standards and Drawing Requirements, covers title blocks, surveys, engineering drawings, site plan drawings, landscape, photometric plans and sign permits.

What it covers

  • A. Process and Procedures
  • Overview of Site Plan Approval
  • Purpose of Site Plan Approval Guidelines
  • Two-Stage Pre-Application Process
  • Scheduling a Pre-Consultation Meeting
  • Attendance at a Pre-Consultation Meeting
  • After the Pre-Consultation Meeting
  • Submission Standards
  • Application for Site Plan Approval
  • Submission Requirements
  • Scope of Application for Site Plan Approval
  • Required Fees for Site Plan Approval
  • Financial Requirements
  • Review of Application for Site Plan Approval
  • Circulation of Site Plan
  • Comments Provided to Applicant
  • Landscape Plan Submission
  • Accessibility Advisory Committee
  • Failure to Approve Plans or Drawings
  • Extension to Site Plan Approval
  • Site Inspection Process
  • Cancelling Site Plan Approval
  • Inactive Applications for Site Plan Approval
  • B. Design Standards and Drawing Requirements
  • Design Standards
  • Drawing Requirements
  • Title Block Requirements for all Drawings
  • Engineering Drawings
  • Erosion and Sediment Control Plan
  • Site Grading and Site Servicing Plans
  • Site Plan Drawings
  • Architectural Drawings
  • Landscape Plan Drawings
  • Planting Details
  • Planting List
  • Tree Inventory and Preservation Plan
  • Photometric Plan
  • Sign Permit
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Site Plan Approval Guidelines

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.