Richmond HillPlanning ApplicationsPlanning guidelines

Development Record Drawing 1st Submission Checklist

Published by City of Richmond Hill

This is the City of Richmond Hill’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Checklist
Published by
City of Richmond Hill
Date
August 2016
Also called
Development Record Drawings Checklist.
For
designer
Building types
All building types
Pages
2

Overview

Richmond Hill's two-page checklist, dated August 2016, for a development's first submission of record (as-built) engineering drawings, with applicant and Town use only columns. It lists what the title and cover sheet, drawing index, title and revision block, relevant drawings and design sheets show, including 19T, D06 and 65M plan numbers, assigned drawing and infrastructure inventory ID numbers, record sewer and manhole data and valve chamber ties, with a revised signature block. It sits on the Design and Construction Guidelines page with the Standards and Specifications Manual.

What it covers

  • Record Checklist
  • Applicant's Contact information
  • Town Use Only - Comments
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Development Record Drawing 1st Submission Checklist

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.