Richmond HillSite Alteration & EngineeringSite Alteration
Published by City of Richmond Hill
This is the City of Richmond Hill’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The Richmond Hill Infrastructure and Engineering Services Department's municipal street lighting design requirements, linked from the city's site alteration permit page, for when a new driveway or entrance moves an existing municipal street light. It covers lights on their own standards and on hydro poles, where pole relocations go through Alectra, and lists clearances such as a 1.2 m clear zone from the curb or driveway edge, 0.6 m from sidewalks and 6.0 m from street trees, cost responsibility, trench details, and a photometric analysis where the shift is significant.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.