Toronto Building's site review report for an installed domestic hot water solar system, the inspection companion to the City of Toronto's separate SDHW backflow prevention device test report. Sixteen numbered lines cover four tests — flow verification, pressure leakage, freeze protection and controller — then a visual pass over plumbing connections, relief valves, pipe slope and insulation, structural attachment against the roof report, collector and tank location, wiring against the Ontario Electrical Code, instrumentation, controller position, monitoring equipment and the system manual.