This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The mandatory inspection sequence for a deck, the shortest of six City of Brampton sheets that reproduce what is printed on the back of a permit card, each covering a different kind of residential project. Three inspections are listed in the order they are requested: footing, structural framing, and final. Companion sheets in the same series cover below grade entrances, basement finishes, additions and interior alterations, garden suites, and two and three unit dwellings, each with a longer sequence of its own.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.