Brampton · Checklistswritten

Start of Construction for Three-Unit Dwelling

Published by City of Brampton under Welcome

Agencies
Ontario One Call · TSSA
Applies to
contractor
Work types
conversion · additional dwelling unit
Instruments
OBC 7.6.1.3 (5) · SB-12 · CAN/CSA-B125

The City of Brampton Building Division's start of construction sheet for a three-unit dwelling, the three-unit counterpart to its two-unit sheet. Building items name a 77 inch finished ceiling, an STC rating of 43, horizontal and vertical fire separations with mineral batt insulation, resilient channel and 5/8 inch gypsum, 30-minute rated floors between suites, SB-12 window details, 20-minute fire doors, interconnected 3-in-1 smoke and CO alarms. Plumbing items cover sprinklers used in lieu of a rating, OBC 7.6.1.3 (5) independent shut-offs, DWHR stacks, water softeners and mixing valves.

What it covers

  • General requirements
  • Safety concerns
  • Building inspections
  • Plumbing
  • HVAC inspections
  • Helpful links and contacts
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Brampton
Category
Checklists · new house
Published under
Welcome — the municipality's own heading
Building types
residential
Tags
checklistinspection-checklistadditional-residential-unitsresidential
Start of Construction for Three-Unit DwellingOpen at brampton.ca