BramptonBuilding PermitsCommercial, Industrial & Institutional

Start of Construction for ICI Projects – New Buildings

Published by City of Brampton

This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Document
Published by
City of Brampton
Also called
Start of Construction Requirements
For
contractor
Building types
All building types
Pages
2
Instruments
NFPA 96 · CAN/ULC

Overview

The City of Brampton Building Division's start of construction sheet for new industrial, commercial and institutional buildings, the front half of a pair completed by its pre-occupancy sheet. It names listings and details gathered before inspection — firestopping at electrical conduits, pipes and fire separation edges, shaft wall assemblies with a note that BMEC ruling 890-01-118 has been revoked for horizontal shaft wall ceilings, fire separations and firewalls — then plumbing pressure testing and backflow preventers, HVAC fire damper cut sheets and the smoke test for NFPA 96 grease ducts.

What it covers

  • General requirements
  • Building inspections
  • Plumbing inspections
  • HVAC inspections
  • Helpful links and contacts
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Start of Construction for ICI Projects – New Buildings

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.