Mandatory Inspections for Two Unit Dwellings

Published by City of Brampton

This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Checklist
Published by
City of Brampton
Also called
Mandatory Inspection Checklist: Two-Unit Dwellings
For
homeowner
Building types
All building types
Pages
1

Overview

The mandatory inspection sequence for a two unit dwelling, one of six City of Brampton sheets reproducing what is printed on the back of a permit card, and the counterpart to the three unit dwelling and garden suite sheets for other additional residential units. Five steps run from start of construction and footings through water service, underground plumbing, drain waste and vents, water distribution and HVAC rough-in, structural framing, backfill and building envelope, to plumbing fixtures, HVAC completion, interior finishes, fire separation, occupancy and final inspection.

What it covers

  • Start of Construction
  • Footings
  • Water Service
  • Underground Plumbing
  • Drain Waste and Vents
  • Water Distribution System
  • HVAC Rough-In
  • Structural Framing
  • Backfill
  • Building Envelope
  • Plumbing Fixtures and Appliances
  • Completion of HVAC System
  • Interior Finishes
  • Fire Separation
  • Occupancy Inspection
  • Final Inspection
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Mandatory Inspections for Two Unit Dwellings

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.