MississaugaSite Alteration & EngineeringRoad Occupancy & Encroachment
Published by City of Mississauga
This is the City of Mississauga’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The City of Mississauga checklist for application form 2924, the road occupancy permit for a municipal service connection or disconnection — water, sanitary and storm water laterals and secondary hydro services. It points to the alteration of road or city equipment permit for new storm infrastructure and to the utility municipal consent permit for regional mainline extensions, then describes the construction liability certificate of insurance, scalable drawings at 1:200 to 1:500 with road-crossing cross-sections, the Region of Peel C receipt, and city storm connection approval.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.