Published by City of Hamilton

This is the City of Hamilton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Form
Published by
City of Hamilton
Date
March 5, 2025
Also called
Single Family, Semi-Detached, Townhouse (Row House), Additional Dwelling Unit (ADU)
Form reference
Ontario Building Code – Division C – Subsection 1.3.3
For
any
Signed by
owner · builder · authorized agent
Building types
All building types
Pages
1
Window
A minimum of three (3) business days for confirmation, and a minimum of two (2) business days to process and issue the permit
Submit to
building@hamilton.ca
Instruments
Ontario Building Code – Division C – Subsection 1.3.3 · Building By-law 15-058 · Building Code Act, 1992

Overview

The City of Hamilton Building Division's occupancy permit application for a new single family, semi-detached or townhouse dwelling and for internal or detached additional dwelling units, the low-rise counterpart to the city's multi-unit residential, industrial, commercial and institutional version, with a separate form for each unit. Box A and Box B list water meter, sanitary sewer dye test certificate, radon rough-in and final as-built survey items; Box C runs through structure and envelope, fire ratings, smoke alarms, garage gas proofing, grading as per OBC 9.14 and septic system.

What it covers

  • Application type
  • Address
  • OBC requirements – confirm these requirements are completed by checking the box
  • Owner/Builder/Authorized Agent Information (must be completed in full)
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Application for Occupancy Permit – Single Family, Semi-Detached, Townhouse (Row House), Additional Dwelling Unit (ADU)

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.