TorontoSite Alteration & EngineeringRoad Occupancy & Encroachment

Appendix B – Utility Circulations Contacts

Published by City of Toronto

This is the City of Toronto’s document, as published on its website on 20 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Document
Published by
City of Toronto
Date
July 14, 2026
Also called
TPUCC Contact Information
For
contractor
Building types
All building types
Pages
2
Agencies
City of Toronto Transportation Services · Metrolinx · University of Toronto
Instruments
Municipal Consent Requirements

Overview

Appendix B to the City of Toronto's Municipal Consent Requirements, carried on the City's non-utility cut permit application path. Two pages tabulate the utilities a drawing set circulates to — Toronto Hydro-Electric System, Enbridge Gas Distribution, Bell Canada, Rogers, Beanfield, Enwave, Hydro One, the TTC, Zayo, Telus, Teraspan, Videotron and others — each with an escalation contact, a circulation e-mail and the accepted submission type. A second table lists non-TPUCC members Metrolinx and the University of Toronto with the zones their circulation covers.

What it covers

  • Appendix B – Utility Circulations Contacts
  • Non-TPUCC Members
  • Notes
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Appendix B – Utility Circulations Contacts

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.