MarkhamBuilding PermitsSecond Suites

Secondary Suites Guide for Homeowners

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
April 2026
Also called
Secondary Suite Guide for Homeowners
For
homeowner
Building types
All building types
Pages
30

Overview

The City of Markham Building Standards' Secondary Suites Guide for Homeowners, dated April 2026, on adding a secondary suite (also called an accessory suite, second suite or secondary unit) within a detached house, semi-detached house or row townhouse, under the 2024 Ontario Building Code and Zoning By-law 2024-19. It covers minimum setbacks and parking, then fire separation, STC ratings, fire department access, exiting and egress, smoke and carbon monoxide alarms, room areas, ceiling heights, door sizes, natural lighting and building services, and closes with building permits, inspections and registration.

What it covers

  • Background
  • What Is A Secondary Suite?
  • Zoning
  • Minimum Setbacks
  • Parking Requirements
  • Ontario Building Code
  • Fire Separation Requirements
  • Wall / Floor STC Rating
  • Exiting and Egress
  • Smoke Alarms
  • Carbon Monoxide Alarms
  • Room Areas
  • Ceiling Height
  • Door Sizes
  • How to Apply
  • Building Permit Requirements
  • Building Inspections
  • Registration
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Secondary Suites Guide for Homeowners

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.