Also from BlinKode: CodeEase →
MiltonBuilding PermitsCommercial, Industrial & Institutional
Published by Town of Milton
The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →
This is the Town of Milton’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
A six-page energy efficiency compliance checklist for Part 9 non-residential buildings, based on Division 4 of Ontario Building Code Supplementary Standard SB-10 and made available by the Ministry of Municipal Affairs and Housing, version 1, May 2017. It opens with designer information and a scope test, then sets out the building envelope thermal table by degree-day zone, air infiltration, HVAC, ducts, service water heating, lighting, lighting controls and electric motors. The Town of Milton posts it as its Part 9 SB-10 form.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.