Permit Application Checklist: OBC Part 3 Large Buildings

Published by Town of Milton

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the Town of Milton’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Checklist
Published by
Town of Milton
Date
Feb. 2019
Also called
Industrial, commercial and institutional permit application checklist
For
designer
Building types
All building types
Pages
2

Overview

The Town of Milton's two-page permit application checklist for large buildings designed under Part 3 of the Ontario Building Code. It lists the documents a permit application for an industrial, commercial or institutional building comes with: other submissions and clearances, forms, the site plan, and architectural, structural, mechanical, electrical and sprinkler drawings, each with a box for provided, missing or not applicable. It ends with the application status the counter staff record, and sits with Milton's ICI building permit pages.

What it covers

  • DOCUMENTS REQUIRED AT TIME OF APPLICATION
  • Other Submissions
  • Forms/Documents
  • Structural Drawings
  • Mechanical Drawings
  • Electrical Drawings
  • Sprinkler Drawings
  • APPLICATION STATUS
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Permit Application Checklist: OBC Part 3 Large Buildings

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.