MarkhamBuilding PermitsHouses

Energy Efficiency Design Summary: Prescriptive Method

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Form
Published by
City of Markham
Date
December 1, 2016
Also called
Energy Efficiency Design Summary (SB-12) Prescriptive
Form reference
Supplementary Standard SB-12
For
designer
Signed by
designer
Building types
All building types
Pages
2

Overview

The Energy Efficiency Design Summary: Prescriptive Method (Building Code Part 9, Residential), as linked by the City of Markham, a form authorized by OHBA, OBOA and LMCBO and revised December 1, 2016, distinct from the performance summary. A designer uses it for the SB-12 prescriptive method under Subsection 3.1.1., where windows and glazing are not more than 22% of wall area. It records the compliance package, design conditions, energy efficiency substitutions including airtightness, insulation and mechanical values, and the designer, with a guide to completing it.

What it covers

  • A. Project Information
  • B. Prescriptive Compliance
  • C. Project Design Conditions
  • D. Building Specifications
  • Energy Efficiency Substitutions
  • E. Designer(s)
  • Guide to the Prescriptive Energy Efficiency Design Summary Form
  • Building Code Requirements for Airtightness in New Houses
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Energy Efficiency Design Summary: Prescriptive Method

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.