Richmond Hill · Checklistswritten
Published by City of Richmond Hill under Residential Permits
The City of Richmond Hill's checklist for a residential finished basement permit application. Its general information notes that full-height foundation-wall insulation extending no more than 200 mm above the floor applies where existing insulation is altered or absent, that a drainage layer applies where insulation extends more than 900 mm below grade on a building under five years old, and that an HRV unit applies where a sixth bedroom or a solid-fuel fireplace is proposed. Drawings cover washroom layout, plumbing fixtures and floor drains, smoke alarms and carbon monoxide detectors.